Article | REF: AG3011 V1

Workshop scheduling and design. Applications

Authors: Catherine AZZARO-PANTEL, Adrian DIETZ, Serge DOMENECH, Luc PIBOULEAU

Publication date: January 10, 2006

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

5. Workshop design

5.1 Context

This is a major problem in which the workshop configuration and operating conditions of the various stages are sought, usually with the aim of minimizing an investment cost.

By way of illustration, figure 9 groups together the discrete variables corresponding to the workshop configuration: number of pieces of equipment at each processing stage and equipment size (volumes and surface areas have been discretized into three sizes: large, medium and small).

List of optimization variables
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Unit operations. Chemical reaction engineering

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Workshop design