3. Pulse power sources
3.1 Distribution network
3.1.1 Connection to the EDF 400 kV grid
The pace of experiments at Tore Supra (15 to 60 s of plasma every 10 min) makes it unwise to use mechanical energy storage in rotating machines. A direct connection to the 400 kV grid was therefore chosen. This choice, made in close consultation with EDF, is the result of the major constraints that high-power pulsed operation brings to a distribution network; only a 400 kV network is capable of withstanding, in particular, the reactive power demand (150...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Electricity networks and applications
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Pulse power sources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference