4. Permanent electrical power
The permanent power required for the auxiliaries comes from a 15 kV network distributed in the Cadarache center from the 63 kV EDF network. The dispersal of equipment over several hectares has led to the construction of 5 distribution substations with a total power of 10 MVA. The main auxiliaries are :
toroidal field power supply (700 kW) ;
the cryogenic system capable of keeping the toroidal field magnet components cold (1.5 MW);
refrigeration, which removes the heat deposited by the plasma on the materials facing it (1.6 MW).
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Electricity networks and applications
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Permanent electrical power
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference