INTRODUCTION
The principles behind the construction of a protection plan for a medium-voltage public distribution network are described in
The recent development of large-scale decentralized generation connected to medium-voltage grids has brought with it new constraints, particularly in terms of voltage and power flow. While the detection of ground faults is not affected, the detection of polyphase faults cannot always be satisfied with simple overcurrent protection: a directional criterion must sometimes be added. Fault location using fault passage indicators is a new element to be taken into account when constructing protection plans, as it facilitates network reconfiguration after one or more fault trips. It is useful to be familiar with the operating principles of all types of directional protection to identify their fields of application and their limits.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Electricity networks and applications
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Protection plan for medium-voltage public distribution networks
Bibliography
- (1) - WILLHEM (R.), WATERS (M.) - Neutral grounding in high voltage transmission. - Elsevier publishing company.
Also in our database
Standards and norms
- Technical decree – Technical requirements for electrical power distribution - UTE C11-001 -
- Postes de livraison établis à l'intérieur d'un bâtiment et alimentés par un réseau de distribution publique HTA (jusqu'à 33 kV) - UTE C13-100 -
- Raccordement des générateurs d'énergie électrique dans les installations alimentées par un réseau public de distribution - NF C15-400 -
- Effects of current on...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference