![](/assets/images/picto-drapeau-france-3a76576a5d60a512053b4612ab58dae5.png)
6. Building a protection plan for a radial network
6.1 Principles of selectivity between protections
6.1.1 Chronometric selectivity
The principle is extremely simple: only the first circuit-breaker immediately upstream of any fault should open. To achieve this, certain rules must be observed.
SCROLL TO TOPExclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
![](/assets/images/logo-eti-286623ed91fa802ce039246e516e5852.png)
The Ultimate Scientific and Technical Reference
This article is included in
Electricity networks and applications
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Building a protection plan for a radial network
Bibliography
Bibliography
- (1) - WILLHEM (R.), WATERS (M.) - Neutral grounding in high voltage transmission. - Elsevier publishing company (1956).
Also in our database
Standards and norms
- Postes de livraison alimentés par un réseau public de distribution HTA (jusqu'à 33 kV) - NFC 13-100 -
- Technical decree – Technical requirements for electrical power distribution - UTE C11-001 -
- Prescriptions pour le raccordement de micro-générateurs en parallèle avec les réseaux publics de distribution à basse tension - UTE C11-101 -
- Effects of current on humans and pets – Part 1: General aspects...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
![](/assets/images/logo-eti-286623ed91fa802ce039246e516e5852.png)
The Ultimate Scientific and Technical Reference