Article | REF: TBA3005 V2

ERP fire safety – Heating, ventilation, refrigeration, air conditioning and production of steam and domestic hot water

Author: Williams PAUCHET

Publication date: November 10, 2018

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

2. Layout of heat production equipment

2.1 Plants with an output of over 70 kW (CH 5)

SCROLL TO TOP

2.1.1 Equipment installed in the boiler room

Any appliance or group of appliances producing heat and/or cold by combustion, as referred to in section 7.2.7.5, with a total output of more than 70 kW, must be installed in a boiler room that complies with the requirements of title 1 and of the decree referred to in section

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Preparing for construction

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Layout of heat production equipment
Outline