2. Plant control
2.1 Safety file (GE2)
The file must contain :
a notice summarizing the measures taken to comply with the safety regulations;
a site plan, layout plans and facade plans of the proposed constructions, highlighting, on the one hand, the accessibility conditions for emergency vehicles, and more particularly the widths of the roads and the locations of fire bays, and, on the other hand, the presence of any buildings or premises occupied by third parties;
in order to verify specific points relating to safety regulations, sectional and floor plans, as well as any intermediate floors installed between two levels or between the last floor and the roof of the building;
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Preparing for construction
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Plant control
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference