Article | REF: TBA3009 V2

ERP fire safety – Combustible gas and liquefied hydrocarbon installations

Author: Williams PAUCHET

Publication date: March 10, 2019

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

4. Pipes, shut-off and expansion devices

4.1 Compliance and installation of gas equipment (GZ 12)

SCROLL TO TOP

4.1.1 Regulations

These provisions mainly apply to tubes, shut-off devices, pressure regulators and assembly methods and materials (welding processes in particular).

All gas-fired equipment must comply with one of the following provisions:

  • comply with the standards or, failing that, with the specifications set out in the appendix to the amended ministerial orders of March 4, 1996 codifying the rules...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Preparing for construction

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Pipes, shut-off and expansion devices
Outline