6. Glossary
Mast mooring
Connection system between the mast and the structure to be served, ensuring its stability and absorbing mechanical stress.
Lifting device
Device for moving a load or a person at height. It is a piece of work equipment.
Fitness for purpose
Ability of new equipment to perform its functions safely before being put into service for the first time in the European Union. Fitness for use is the responsibility of the manufacturer.
Base frame or base chassis
The lowest section of the unit on which the other components are mounted and supported.
Certificate of Professional Competence (CCP)
Issued by SFECE to its members to certify their technical capabilities....
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Preparing for construction
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Glossary
Bibliography
Regulations
Arrêté du 1 er mars 2004 relatif aux vérifications des appareils et accessoires de levage, JO du 31 mars 2004.
Arrêté du 2 mars 2004 relatif au carnet de maintenance des appareils de levage, JO du 31 mars 2004.
Directive 2006/42/EC of the European Parliament and of the Council of May 17, 2006 on machinery, and amending Directive...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference