4. Lessons learned – Recommendations
4.1 Design – Construction
Water-related issues need to be taken into account right from the design stage, i.e. at the earliest stage of preliminary (or even feasibility) studies.
Here are some key points to bear in mind:
In addition to soil characteristics (resistance, thrust, settling), the presence of water must be investigated. In all cases, have a specialized organization carry out a survey to determine precisely the existence and/or possibility...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Pathologies and building rehabilitation
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Lessons learned – Recommendations
Bibliography
Standards and norms
Unified technical documents – DTU
NV rules define the action of snow and wind on buildings
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference