Article | REF: C7146 V2

Pathology of humidity. Clad walls - Case study

Author: Paul DAHAN

Publication date: May 10, 2013

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

7. ITE thin coating on concrete shell + ITI (60 + 10 retained), in summer

The air gap created by the glue beads is taken into account.

7.1 Calculation notes – Te = 35 °C and HRe = 35 %.

The calculation note in table is required to draw the new Glaser diagram.

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Pathologies and building rehabilitation

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
ITE thin coating on concrete shell + ITI (60 + 10 retained), in summer
Outline