5. Case study: Catalpa project (Bouygues Construction)

The Catalpa project is part of a 4-year nationwide framework contract with the French Ministry of Defense. The project was developed to meet an urgent need for accommodation for the army, while following a modern and environmental approach. The four-year contract began in 2016. In total, more than 4,600 modules have been produced and delivered across 39 operations (figure 10 ).

The different types of modules used in the design of housing buildings (source: Bouygues Construction)
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Construction law and general management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Case study: Catalpa project (Bouygues Construction)