4. Upgrading coal shale by treatment with road binder
-
Pre-project recommendations
The following solutions were planned at the preliminary design stage of the earthworks for the Dourges multimodal platform, based on the authorized operation on the "116/117" slag heap:
use of raw shale for backfill (criterion AR1) and railway subgrades;
production of formoschist by screening, for use in road sub-base (PF2 criteria) and railway sub-base.
-
Conclusions of the market's geotechnical campaign
Project studies prior to the start of work led to the following findings, based on a representative sample of boreholes drilled in the slag heap:
a 0/150 grading curve, with 45% passing 20...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Public works and infrastructure
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Upgrading coal shale by treatment with road binder