2. Method of construction and excavation
The proposed layout of the tunnel and shafts takes the following factors into account:
geological checks and soil homogeneity ;
the type of terrain encountered, which defines the type of machine to be used;
the type of material to be used for the work;
determining the pickling system;
types of injections to be performed ;
possible distances between wells ;
checking high and low water levels;
-
environmental constraints, which are :
utility and concession works already located underground,
surface traffic (pedestrians and vehicles),
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Public works and infrastructure
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Method of construction and excavation
Bibliography
Organizations
AFTES Association française des travaux en Souterrains
FSTT Comité français des travaux sans tranchées
Suppliers (non-exhaustive list)
Akkerman http://akkerman.com
Decon Soltau USA http://[email protected]
Herrenknecht http://[email protected]
Iseki http://[email protected]
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference