6. Construction processes
6.1 From factory to construction site
To better understand this discipline, we need to bear in mind that the construction of a steel bridge combines two activities with different constraints: industrial activity in the factory and civil engineering activity on the worksite, each involving the use of large, heavy parts. The challenge is to reconcile the requirements of both.
The construction process on site is dictated by the natural conditions of the gap to be crossed. Together with the project's functional data, it guides the design of the structure; and for exceptional crossings, it becomes the main component.
Upstream, in-plant manufacturing aims to provide the site with the largest and most finished deck elements possible....
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
The superstructure of the building
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Construction processes