Article | REF: C3522 V1

Clay tile roofs - Canal tiles

Author: Christian LYONNET

Publication date: August 10, 2004

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

4. Laying and fixing tiles

4.1 Laying tiles

  • Installation begins with the running tiles forming the drainage channels.

    The tiles, with the wide part facing up the slope, are laid with an overlap of the tile in the upper row over that in the lower row, according to the "overlap" values specified in the table 1 , and with a lateral spacing of 2 to 5 cm at their widest part.

    On continuous, flat, solid wood or masonry substrates, installation is carried out using a chalk line or layout, and requires the tiles to be wedged. This can be done :

    • or with mortar studs (meeting the...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

The finishing and equipment of the building

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Laying and fixing tiles