4. Laying and fixing tiles
4.1 Laying tiles
-
Installation begins with the running tiles forming the drainage channels.
The tiles, with the wide part facing up the slope, are laid with an overlap of the tile in the upper row over that in the lower row, according to the "overlap" values specified in the table 1 , and with a lateral spacing of 2 to 5 cm at their widest part.
On continuous, flat, solid wood or masonry substrates, installation is carried out using a chalk line or layout, and requires the tiles to be wedged. This can be done :
or with mortar studs (meeting the...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
The finishing and equipment of the building
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Laying and fixing tiles
References
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference