Article | REF: M3612 V1

Refractory lining of induction holding furnaces for the foundry

Author: Jean-Pierre GAUCHÉ

Publication date: June 10, 2013

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

4. Operation and maintenance

4.1 Monitoring and controls

Monitoring and controls can be summarized in 6 main phases; the lifespan of the furnace, which can reach 12 to 15 years, depends on the respect of these stages:

  • daily monitoring of electricity consumption, particularly during the weekend;

  • daily monitoring of the electrical power absorbed by the inductor and the oven;

  • weekly maintenance of liquid metal inlet and outlet traps;

  • weekly temperature checks on the furnace casing ;

  • monthly cleaning of bath surface ;

  • annual inspection of coating by infrared thermography.

Correlation...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Industrial thermal engineering

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Operation and maintenance