5. Plutonium multi-recycling in 4th generation nuclear reactors
5.1 Scenarios studied
The focus here is solely on scenarios for the deployment of a complete or partial plutonium-recycling RNR fleet, in cohabitation with PWRs, in this case EPRs. These scenarios illustrate the performance of the closed uranium/plutonium cycle. The scenarios are as follows:
deployment of a complete RNR-Na park in two stages from 2040, called RNR_2040 (figure 5 );
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Nuclear engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Plutonium multi-recycling in 4th generation nuclear reactors
Bibliography
- (1) - CEA Direction de l'énergie nucléaire - La gestion durable des matières radioactives avec les réacteurs de 4e génération. - Déc. 2012 http://www.cea.fr/
- (2) - Loi n° 91-1381 du 30 décembre...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference