![](/assets/images/picto-drapeau-france-3a76576a5d60a512053b4612ab58dae5.png)
8. Development status and commercial maturity
The first phase of Basic Design was completed at the end of 2002, with the drafting of a preliminary safety report. At the same time, the functional capability and performance of all new systems and components were successfully evaluated under realistic and conservative boundary conditions on large-scale test facilities in Finland, Switzerland and Germany (table
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
![](/assets/images/logo-eti-286623ed91fa802ce039246e516e5852.png)
The Ultimate Scientific and Technical Reference
This article is included in
Nuclear engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Development status and commercial maturity
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
![](/assets/images/logo-eti-286623ed91fa802ce039246e516e5852.png)
The Ultimate Scientific and Technical Reference