
8. Development status and commercial maturity
The first phase of Basic Design was completed at the end of 2002, with the drafting of a preliminary safety report. At the same time, the functional capability and performance of all new systems and components were successfully evaluated under realistic and conservative boundary conditions on large-scale test facilities in Finland, Switzerland and Germany (table
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!

The Ultimate Scientific and Technical Reference
This article is included in
Nuclear engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Development status and commercial maturity
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!

The Ultimate Scientific and Technical Reference