Article | REF: REX36 V1

Validation of co-simulation strategies for naval applications of fluid-structure interaction

Author: Jean-François SIGRIST

Publication date: September 10, 2024

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

2. Implementation of the project – actions taken

2.1 Technical aspects

The general objective of the project is to evaluate the possibilities offered by co-simulation strategies [Piperno-Farhat, 2000 ; Geuzaine  et al. , 2003 ; Benaouicha, 2007 ; Hou  et al. , 2012], coupling industrial tools. The aim is to build an incremental approach to the implementation and validation of these methods, starting from “academic” cases in order to reach the complexity of cases representative of industrial needs.

The first work is undertaken on an exploratory basis on the simulation of flow-induced vibrations in the context of “frequency locking”, i.e. the synchronization of the movements of a cylinder (two-dimensional, suspended and placed...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Mechanical functions and components

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Implementation of the project – actions taken