Article | REF: SE1650 V1

Reliability and risk-based maintenance methods

Author: Gilles ZWINGELSTEIN

Publication date: July 10, 2015

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

7. AP-913 method developed by INPO

7.1 Origin and background

In the early 1990s, a number of American nuclear power plant operators achieved outstanding availability results thanks to their maintenance programs, despite unplanned shutdowns caused by accidental equipment failures. Each of these operators then set up interdisciplinary groups to analyze the causes of these failures. These groups found that there were no simple explanations for the problem, and that there was a need for a more global approach to solving equipment reliability issues. To help US operators solve this problem, the Institute of Nuclear Power Operations (INPO) published a report in 2001 entitled Reliability Process Description AP-913

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Safety and risk management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
AP-913 method developed by INPO
Outline