Article | REF: SE1660 V1

John Moubray's RCM2™ reliability-based maintenance method

Author: Gilles ZWINGELSTEIN

Publication date: September 10, 2015

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

4. Example of application to a chain conveyor on a palletizing line

4.1 Description of the palletizing line

The example presented and used to illustrate the RCM2 approach is taken from a study conducted at a paper mill that manufactures coated packaging board from recycled paper . Board manufacture comprises three successive phases: preparation of the pulp, manufacture of the coated board with additional treatments, and preparation for delivery. The example concerns the workshop that packs and palletizes cardboard for truck transport. The palletizing line comprises a wide range of equipment. At the infeed to the line, empty pallets are received...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Maintenance

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Example of application to a chain conveyor on a palletizing line