Article | REF: AG3151 V1

Project management - Case of an agricultural cooperative

Author: Jean LE BISSONNAIS

Publication date: April 10, 2000

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Overview

Français

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHOR

  • Jean LE BISSONNAIS: Engineer from École Centrale de Paris - Marine engineering (civil) - Honorary Chairman, AFITEP - former Project Director and Project Control Manager in several engineering companies

 INTRODUCTION

The CAVE (Coopérative Agricole de la Vallée de l'Espérance) project is based on a real-life situation, deliberately simplified and schematized. No particular technical knowledge is required to deal with the proposed case.

The date is October 1 1999.

The Board of Directors of the CAVE, where you have just been hired, notes that, as every year, Mr. Alain, the director, was obliged to have a large part of the harvest dried, to ensure its preservation. This operation was carried out externally, by an independent company which invoiced 829,500 F. This drying involved the various products harvested successively (oilseeds, cereals, corn), which we have reduced, to simplify the case, to a single equivalent product.

The only alternative would be to build a drying plant, owned by the CAVE, for which Mr. Bernard, the maintenance manager, had consulted SPORT (Société Picarde d'Outillages et Réalisations Techniques). In 1995, Mr. Bernard, the maintenance manager, had consulted SPORT (Société Picarde d'Outillages et de Réalisations Techniques), who had sent him an estimate. However, due to a lack of funds, the project was postponed.

Quantities to be processed this year were 11,850 t, counted in reference dried product equivalent, and are likely to increase by a further 8%/year over the next 7 years (taking into account the switch to more demanding varieties in terms of drying).

Drying must take place between July 1 and October 30 each year, the harvest period.

Today, Crédit Agricole is granting the CAVE a loan repayable over 10 years, with a fixed interest rate of 9% per annum, to enable it to carry out this investment, should it be decided to do so.

Many of the ISO 10006 processes are only mentioned, or summarized at their output; in the case of small projects, this often happens. For this study, please refer to the article "Project management. Processes".

Note :

The author would like to thank Établissements André Laboulet (forage and oilseed seeds, corn, turf) in Airaines, which provided him with the idea and elements for this case study.

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Design and production

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Project management