Article | REF: GE1033 V1

Cross-issues in the restoration of a heavily modified watercourse

Author: Eric CHANAL

Publication date: October 10, 2019

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

3. Objectives

In the case in point, the two projects described in this article were triggered primarily by the issue of flood protection, but from two significantly different angles:

  • for the Petit Rosne, in Sarcelles-village, the challenge of reopening the river is first and foremost to enable surface runoff to re-enter the riverbed under optimum conditions. Indeed, during the catastrophic floods of 1992 (figure 5 ), this area remained under 1.50 m of water for almost three weeks, even though the river, which was underground at the time, had rapidly regained its flow and discharge capacities;

  • for the Croult, in Gonesse, the initial objective was to reduce the frequency of flooding in the housing estate known as...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Water technologies

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Objectives