Article | REF: G9068 V1

Continuity management: drawing up and implementing a BCP

Author: Gilles TENEAU

Publication date: May 10, 2019

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

3. Feedback

3.1 Case A – Service continuity project proposal

A bank "A" merged with a bank "B", and these two banks created a third group, an EIG "C". The request was to set up a continuity plan within this EIG "C".

SCROLL TO TOP

3.1.1 Definition and objectives

A project management team has been set up, with the primary aim of producing a BCP to guarantee the provision of an agreed level of service in the event of a major incident, and to enable better consideration of major risks in the face of IS vulnerabilities. One...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Environment

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Feedback