3. Manufacturing launch
Once the raw part drawing has been drawn up, and to prepare for the manufacturing launch of a part (especially for series production), a file will be established which will define: production rates, lead times, acceptance conditions, etc., data which will serve as a basis for drawing up the necessary technical documents:
instruction sheets, specifying all manufacturing parameters for the various production operations: melting, molding, coremaking, finishing, inspection;
routings, which will indicate all production cost elements: machine time, labor time, material consumption, calibration, etc. ... ;
the tooling sheets that will enable us to launch the design and production of all the tooling required for manufacturing.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Metal forming and foundry
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Manufacturing launch
References
In Engineering Techniques
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference