6. Justification of energy screens and tunnels
6.1 Energy screens
These are mainly cast walls, but examples of secant pile walls also exist. More specific structures, such as Lutetian or Muscovite walls, whose posts are fitted with heat exchanger tubes, can also be envisaged.
The justification for the molded wall depends on the position of the heat exchanger tubes. Two cases are to be considered:
the heat exchanger tubes are located only in the moulded wall plug ;
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Soil mechanics and geotechnics
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Justification of energy screens and tunnels
Bibliography
Standards and norms
- Justification of geotechnical structures – Eurocode 7 national application standards – Deep foundations. NF P 94-262, AFNOR, 208 p. - AFNOR - 2012
- Fundamentals. American Society of Heating Refrigeration and Air – Conditioning Engineers, Inc., Atlanta, USA. - ASHRAE - 2009
- modifié par le décret n° 2015-15 du 8 janvier 2015 portant sur la géothermie minime importance. - Décret n° 78-498 - du 28 mars 1978 ...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference