4. Design of crushing and grinding plants for rock materials
4.1 Coarse crushing
The primary crushing facility is a vital part of the plant, as it is at the head of the circuit and sometimes receives huge blocks. Consequently, the size and structure of this plant must take into account :
the capacity of trucks and machinery; in particular, 20 to 38 m 3 shovels are used to load crushers, and 150 to 320 t trucks;
the almost general need for a grizzly (bar grate or fixed rails) at the crushing head;
storage before and after the crusher;
maintenance operations requiring suitable surfaces;
the fact that the crushing operation...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Unit operations. Chemical reaction engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Design of crushing and grinding plants for rock materials
Economic data
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference