2. Main stages in EMC system development
2.1 Identify system subassemblies/equipment
This first stage, which is very preliminary since the system definition is still only at the prototype stage, aims to identify the main electrical functions and their location in the system, in fact the hard points where incompatibilities are proven or highly probable.
During this process, regular feedback between EMC and design managers is necessary to orientate the design guidelines and reduce the proximity of disruptive functions to sensitive functions. It should be pointed out that EMC constraints are not always easy to make design offices from other sectors understand/accept, even at a preliminary stage of development.
This stage requires a good knowledge of the electronics and the EMC...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Conversion of electrical energy
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Main stages in EMC system development
Bibliography
Standards and norms
- Space Engineering – Electromagnetic Compatibility. - Norme ECSS-E-ST-20-07c - (7 février 2012)
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference