4. Sizing wastewater and blackwater networks
4.1 Calculation elements and methods
-
Orthogonal representation
Key network elements (horizontal pipes, chutes, etc.) are mapped on an orthogonal projection, usually an architect's plan. This representation, in which sanitary fixtures are also positioned, shows that networks are centered around waterfalls, as illustrated in figure 12...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Finishing work and technical packages
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Sizing wastewater and blackwater networks
Bibliography
Standards and norms
- Building work – Sanitary plumbing for buildings – Part 1-1-2: Evacuation systems – Standard technical specifications - NF DTU 60.1 - (12/2012)
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference