Article | REF: TBA3023 V1

ERP fire safety – Type V establishments - Places of worship

Authors:

Publication date: December 10, 2014, Review date: May 11, 2020

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

4. Smoke extraction (Article V 6)

§ 1 In mitigation of article DF 7 (§ 7 of [TBA 3 004] ), only the following must be cleared of smoke:

  • basement rooms with a surface area of over 300 m 2 ;

  • rooms with a surface area of more than 300 m 2 on the first floor or upper floor, and with a ceiling height of less than 4 m.

The establishments referred to in this article are class 1 for the purposes of determining the coefficient as...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Preparing for construction

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Smoke extraction (Article V 6)