
2. Construction
2.1 General design of the facility (article OA 5)
1. Notwithstanding the provisions of articles CO 1 to CO 5 (§ 1.1 to § 1.5 of
the use of 2 separate...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!

The Ultimate Scientific and Technical Reference
This article is included in
Preparing for construction
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Construction
Bibliography
Also in our database
Regulations
Order R. 111-15 of the French Construction and Housing Code concerning provisions applicable to floors other than the first floor of residential buildings.
Article R. 123-3 of the French Construction and Housing Code – Amended by Decree no. 2009-1119 of September 16, 2009 concerning the obligations of builders, owners and operators of establishments open to the public.
Article...
Standards and norms
- Protection des structures contre la foudre - NF C 17-100 - 12-97
- Practical guide – Lightning protection – Part 2: Risk assessment - UTE C17-100-2 - 01-05
- Fire safety systems (SSI) – Safety power supplies (AES) - NF S 61-940 - 06-00
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!

The Ultimate Scientific and Technical Reference