Construction cycle. Stop and restart of concrete pouring

Author: Pierre SERIN

Publication date: June 10, 2017

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

2. Characteristics of the work

There are other obligations that also influence the location of concrete reworks (or stops): the building's load-bearing structure and its design. In order to meet these requirements, it is necessary to study the various elements making up the structure and how they relate to each other and to the structure.

2.1 Presence of masonry

If the walls and spandrels were to be built in masonry rather than in reinforced concrete, they could be executed at different times. This would allow for greater flexibility in planning.

SCROLL TO TOP

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Preparing for construction

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Characteristics of the work