
2. Defects in performance
2.1 Importance of working drawings
The final quality of a project depends to a large extent on the quality of the working drawings (PEO).
A good execution file is a prerequisite which, if not sufficient, is absolutely necessary to reduce the number of accidents involving reinforced concrete structures. These should be drawn to a scale that enables the building site to fully understand them, in all their details. This scale must be the same in both directions.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!

The Ultimate Scientific and Technical Reference
This article is included in
Pathologies and building rehabilitation
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Defects in performance
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!

The Ultimate Scientific and Technical Reference