3. End of operation

3.1 Transfer of the plant to the owner

The lifespan of PV installations should not be confused with the duration of the purchase contract for the electricity produced. While purchase contracts are generally for 20 years, the actual lifespan of a photovoltaic installation is estimated at over 40 or 50 years, using quality components and with regular maintenance.

At the end of a purchase contract, several options are available.

In the case of a roof or land lease, the owner of the property generally becomes the owner of the solar power plant.

Very few PV power plants have exceeded the term of their purchase contract. The transfer of power plants is usually the result of a...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Energy resources and storage

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
End of operation
Outline