3. Risk control measures
3.1 Choosing a projection risk management strategy
The risk assessment of an installation can sometimes show that the projection risk is unacceptable, either directly on people, or through the potential domino effects induced, provided that they were initially integrated into the approach, i.e. that targets, which could lead to an overaccident if hit by one or more projectiles, had been previously identified.
It may therefore be necessary to implement additional measures to eliminate the risk at source or, more reasonably, to limit its occurrence or consequences.
Risk management measures can be broadly classified according to three main strategic orientations that combine preventive and protective measures:
- ...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Safety and risk management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Risk control measures
Bibliography
Digital media
ARIA database http://www.aria.developpement-durable.gouv.fr/index.html
Regulations
Arrêté du 29 septembre 2005 relatif à " l'évaluation et à la prise en compte de la probabilité d'occurrence, de la cinétique, de l'intensité des effets et de la gravité des conséquences des accidents potentiels dans les études de dangers des installations classées soumise à autorisation ". JO n° 234 du 7 octobre 2005 – NOR DEVP0540371A
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference