Article | REF: SE5072 V3

Pressure Vessels Regulations. Storage and Filling of Liquified Petroleum Gases (LPG)

Author: Serge ABAUZIT

Publication date: September 10, 2024

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

3. Commissioning new ESPs

The commissioning of new ESPs is covered by the Order of November 20, 2017 on pressure equipment in service, applicable since 1 er January 2018.

Apart from compliance with the requirements seen above for placing on the market, certain equipment (detailed in Article 7 of the Order) must be subject to declarations of commissioning (DMS) to the prefecture, and commissioning controls (CMS, new in the Order of November 20, 2017).

For LPG sites, these are the :

  • Risk category IV LPG storage tanks with a PSV greater than 10,000 ;

  • Risk category III LPG piping.

Declarations of commissioning concern equipment commissioned after July 22, 2000. They should not be issued retroactively for equipment installed...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Safety and risk management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Commissioning new ESPs