Article | REF: C3280 V1

Fire safety in ERP buildings

Author: Cabinet CASSO et Cie

Publication date: November 10, 2008

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


10. Administration control

This control is carried out at the building permit stage, during the acceptance inspection of the ERP, before it is opened to the public, and during periodic inspections by the Safety Commission during operation. The table in article GE 4 of the June 25, 1980 safety regulations sets out the frequency of inspections according to the ERP's classification.

However, this regulatory frequency can be modified by the Mayor or the Prefect after consulting the Safety Commission.

In the case of very large and/or complex establishments that don't fit neatly into the "regulatory mold", the Safety Commissions seek the opinion of the Central Safety Commission, based at the Ministry of the Interior (Civil Security Directorate).

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Safety and risk management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Administration control
Outline