4. Experiment
4.1 Nominal operation
Each control center determines the navigation message via a network of ground stations. It then communicates with the space segment via the uplink station network.
SCROLL TO TOPA fictitious system (figure 2 ) consisting of two ground control centers (CC) for a redundant mission has been modeled. Each CC benefits from several internal redundancies represented...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Safety and risk management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Experiment
Bibliography
Bibliography
Software tools
Open AltaRica software https://www.openaltarica.fr/docs-downloads/
Websites
Institute for Risk Management – IMdR https://www.imdr.eu
Standards and norms
- Information Technology – Cloud computing – Reference architecture - ISO/IEC 17789:214 - 10-14
- Maintenance – Maintenance terminology - NF EN 13306 - 01-18
- Functional safety of electrical/electronic/programmable electronic safety-related systems - IEC 61508 - 04-10
- Machine condition monitoring and diagnostics – Vocabulary - ISO 13372:2012 - 09-12
- Nuclear power plants – Control room design...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference