2. Steps in the AP913 process developed by INPO
2.1 Preamble
INPO does not recommend specific solutions for implementing each process in AP913. It leaves it up to operators to decide on the appropriate strategy for deploying AP913, adapted to the specific features of the nuclear power plants they operate. Apart from the USA, other countries have adopted this approach in full or in part, adapting the various criteria of this maintenance strategy for existing plants (Belgium, France, Korea) or those under construction, including the EPR™ (European Pressurized-Water Reactor ).
AP913 aims to increase equipment reliability to improve safety and availability. It describes the processes for continuous improvement of equipment and system reliability. The recommendations of AP913 include not only classic MBF methodology,...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Safety and risk management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Steps in the AP913 process developed by INPO
Bibliography
Websites
EPRI website providing access to the PMBD – Preventive Maintenance Basis Database http://pmbd.epri.com (page consulted on December 23, 2015)
NRC website providing access to EPIX http://nrcoe.inl.gov (page consulted on December 23, 2015)...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference