Article | REF: T4305 V1

Maintainability. Maintenance

Author: Pierre CHAPOUILLE

Publication date: December 10, 1987

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

4. Experimental verification

As soon as a system is available at the prototype stage, it is necessary to carry out experimental checks to ensure that the maintainability predictions made during development are correct, and that the specifications are likely to be met. These verifications can be qualitative or quantitative, the latter covering both corrective and preventive maintenance times. These checks must be carried out before statistical demonstration tests can be carried out, if they are provided for in the contract.

4.1 Qualitative verification

It constitutes a review of the project, and will be carried out by means of critical examinations covering important points for maintainability such as :

  • check that plans and instructions for...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Design and production

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Experimental verification