3. Design of discontinuous workshops
3.1 Introduction to design and remodeling
The problem of designing batch plants is a major industrial issue, and forms part of a series of decisions ranging from the definition of the company's strategic choices to the optimization of production (figure 9 ). Increasingly, the current economic context is making the empiricist approach to workshop design, which in many cases led to over-equipment, untenable.
The aim of design is to determine the number and dimensions of the equipment required for each of the unit operations involved in the manufacturing processes of the various products, in order to ensure a given level of production, while...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and production
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Design of discontinuous workshops
Bibliography
Main software
ARENA (Modeling Corporation) provides a library of predefined, fairly simple objects, which the user can then use to build his or her own model, giving great flexibility. The resulting simulator can be coupled with external modules written in C or FORTRAN.
WITNESS (Lanner Group ltd.) offers an extensive library of predefined objects for rapid...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference